Seoyu 1-dong Public Parking Lot Stone Wall Maintenance

Gwonseon-gu announced on the 1st that it conducted a safety inspection of the stone wall already installed at the Seoyu 1-dong public parking lot site, as partial cracks in the wall raise concerns about safety accidents during the summer rainy season.
The Seoyu 1-dong public parking lot was established in October 2003 and converted to a resident priority parking system on July 1, 2011, becoming an established comfortable and convenient parking space for residents.
However, upon inspection, the stone wall of the public parking lot was found to be deteriorated with partial cracks. A CCTV survey conducted through the buried sewage pipe revealed cracks in some sections of the pipeline connected to the domestic sewage line.
Park Hyung-sik, head of the Economic and Transportation Division, stated, "While it is not deemed to be immediately dangerous, we plan to conduct repairs to the sewage pipeline and stone wall sections in May to preemptively block medium- and long-term risk factors caused by heavy rainfall during the summer rainy season."




Loading comments…